Two Buildings. One Dedicated Focus.

Building A handles cutting, fabric processing, uniform assembly, and logistics. Building B is the tailoring wing — canvassing, pressing, hand-finishing, and quality review.

20,000
m² Total Floor Area
6
Production Departments
2
Dedicated Buildings
300+
Workers On Campus
Building B

Suit Workshop

Full canvassing line, Veit press bucks, hand-finishing bays.

8,500 m²
Building A — Level 1

Cutting & CAD

Gerber automated tables, marker-making, spreading room.

2,800 m²
Building A — Level 2

Uniform Assembly

Modular sewing lines, fusing press, embroidery, labeling.

4,200 m²
Building A — Level 3

QC, Finishing & Pack

AQL inspection, final pressing, packing lines.

4,500 m²
KlenidiSuit Production Campus — Nansha, Guangzhou · Est. 2005

Inside Every Room

Cutting floor photo
CAD screen
Plotter output
01

Cutting Room & CAD

Two Gerber automated cutting tables. CAD team uses AccuMark for grading and marker-making, achieving 85%+ marker efficiency on structured fabrics.

Daily Capacity6,000+ pieces
EquipmentGerber GERBERcutter® × 2
Marker Efficiency> 85%
CAD SystemGerber AccuMark
Suit workshop photo
Canvas chest piece
Pressing bucks
02

Suit Workshop (Building B)

120 jacket makers handle the full construction: interlining, pad stitching on canvas chest pieces, sleeve setting, collar shaping, and lapel rolling. Italian Veit steam-press bucks for final shaping.

Jacket Makers120 on floor
ConstructionFull canvas / Half / Fused
Press EquipmentVeit (DE) + Hirose (JP)
Min. Order100 pcs/style
Uniform sewing line
03

Uniform Production Lines

Four modular sewing lines reconfigurable between categories. All stress seams double-needle lockstitch for institutional durability. Kannegiesser fusing presses for controlled temperature.

Operators150+
Lines4 modular
Min. Order200 pcs/style
Sample room photo
04

Sample Room

18 dedicated sample makers, never pulled onto bulk production. First samples in 12–18 working days. Counter samples and revisions handled in-house.

Sample Makers18 dedicated
First Sample12–18 working days
Revisions7–10 working days
QC inspection floor
05

Quality Control & Finishing

QC reports independently from production. Three-stage process: inline checks, end-of-line inspection, and pre-shipment AQL 2.5 inspection.

QC StandardAQL 2.5
StagesInline · End-of-line · Pre-ship
3rd PartySGS / Bureau Veritas welcome

What's Running on the Floor

EquipmentBrandQtyUse
Automated CutterGerber (USA)2Bulk fabric cutting
CAD SystemGerber AccuMark4 stationsPattern grading, markers
Fusing PressKannegiesser (DE)4Interlining fusing
Steam Press BuckVeit (DE)18Jacket pressing
Tunnel FinisherHirose (JP)3Volume finishing
Lockstitch MachinesJuki (JP)160+Assembly, stress seams
EmbroideryTajima (JP)6 headsLogo embroidery
Color MatchingVerivide (UK)4Shade sorting